Examples of Altering the Time Base
- Here we have an input signal period of 40uS. Now
the Time Base control is set to 5uS/div so as is expected
the signal covers 10 divisions on the display.

- Here we have an input signal period 40uS. Now the
Vertical gain control is set to 10uS/div so as is
expected the signal covers 4 divisions on the display.

- Here we have an input signal with period of 40uS.
Now the Time Base control is set to 0.5uS/div so as is
expected the signal does not fit on the display.
Page maintained by EIE WebMistress
Revised: Friday, 17 July 1998